Ahmedabad, Gujarat · Serving India, the United States, Canada, Europe and the Middle East

Industries

Manufacturing ERP and MRP implementation

Multi-level bills of materials, work-order routing and live shop-floor scheduling.

Two workers operating a machine on a factory floor

The problem

What breaks today, and what we usually build

What breaks today

Spreadsheets track work in progress and never match the floor count. Job costs arrive weeks late, and an unplanned machine breakdown stops a line.

What we usually build

One ERP with MRP, barcode work orders on shop-floor tablets, planned maintenance, and scrap recorded at each work center.

Automations worth building

Low-stock alerts for raw materials, machine downtime notifications, and yield variance worked out as production is recorded.

What we measure in discovery

Work-in-progress accuracy, days to close job costs, unplanned downtime hours.

FAQ

Questions about manufacturing projects

Platforms, modules, measures and where to begin.

Ask us directly
Which platform fits manufacturing and heavy engineering?

Odoo Enterprise or ERPNext for custom and make-to-order manufacturing; Dynamics 365 for high-volume plants. We confirm the fit in a platform selection, with written reasons for and against each option.

Which modules do you usually start with?

Manufacturing & MRP, Inventory & Warehouse, Maintenance (CMMS) and Purchase & Vendors. The diagnostic decides the order.

What do you measure before changing anything?

Work-in-progress accuracy, days to close job costs, unplanned downtime hours. We record a baseline during discovery so the change can be measured against it.

Where do we start?

With the Operations & Systems Diagnostic: find out what is really slowing the operation down. It takes 1–2 weeks and ends with a written report you can use with any vendor.

Next step

Not sure what to fix first?

Book a 30-minute consultation. We look at how your operation runs and tell you what we would do first, including when the answer is a simpler tool.