Delivery
Data migration
Customers, vendors, products, stock and balances moved from spreadsheets, Tally, QuickBooks or an old system, cleaned and reconciled before cutover.

- 3–6 weeksTypical migration-only project
- Trial loadsBefore the final cutover
- Line by lineOpening balance reconciliation
How we build
How we approach data migration
Migration is where implementations quietly fail: duplicate customers, products with three names, balances that do not tie back to the ledger. Moving bad data into a new system makes the new system look wrong.
Read more
We treat migration as its own workstream with its own sign-off. Your team decides what to merge, archive or drop; we write the rules down, script them, and prove the result with trial loads before cutover.
Connected to your core systems
- REST & webhooks
Typical stack
- Excel and Google Sheets
- Tally
- QuickBooks and Xero
- HubSpot, Pipedrive and Freshworks
- Legacy SQL databases
- Odoo
- Zoho One
- Salesforce
- Microsoft Dynamics 365
- ERPNext / Frappe
What we deliver
Capabilities
Source audit
Every source listed and profiled: record counts, duplicates, missing fields and the spreadsheets that hold the real data.
Mapping and cleansing rules
Field-by-field mapping and written rules for duplicates, inactive records and open transactions, agreed with your team.
Trial loads
Scripted, repeatable loads into staging, run as many times as it takes, each checked against a reconciliation sheet.
Reconciliation
Record counts, open documents and opening balances compared line by line, and signed off by your finance lead.
Cutover plan
Data freeze, final load, verification and a rollback point, timed for a quiet window.
Documentation
Mapping, rules, scripts and reconciliation results kept, so an auditor can see what moved and why.
How we deliver
From audit to hypercare
-
Source audit and mapping
1 week
We profile every source, list duplicates and gaps, and map each field to the target with your team.
-
Cleansing and trial loads
1–3 weeks
Cleansing rules are scripted and trial loads run into staging until the reconciliation sheet balances.
-
Reconciliation and cutover
1–2 weeks
Your finance lead signs off the opening balances, data entry freezes, and the final load runs with a rollback point.
Engineering standards
How we build, compared with the usual shortcut
Everything is copied across as it is, duplicates and all.
Your team decides what to merge, archive or drop, and the rules are written down before any load.
One load at go-live, checked by nobody until month end.
Repeatable trial loads, each checked against a reconciliation sheet before cutover.
Open invoices and stock are re-keyed by hand after go-live.
Open documents and stock positions are part of the migration and the reconciliation.
Can you migrate from Tally to Zoho Books or Odoo?
Yes. Masters, open balances and the transactions you need are exported, cleaned and loaded, with GST details carried across and balances reconciled before cutover.
Do you migrate historical transactions?
Usually only open documents and balances, with history kept read-only in the old system or an archive. Full history is possible when an auditor or a report needs it; it is agreed in the scope.
Who decides what gets cleaned up?
Your team. We show the duplicates and gaps and propose rules; the people who own the data decide, and the decision is written down.
How long does a migration take?
A migration-only project usually takes 3–6 weeks. Inside an implementation it runs alongside configuration.