Production orders are launched only to discover halfway through that a critical sub-assembly is out of stock.
Workstations sit idle while expedited freight costs decimate job margins.
M-05 · Operations
Plan production schedules based on actual machine capacity and material availability
Why the current way breaks
Production orders are launched only to discover halfway through that a critical sub-assembly is out of stock.
Workstations sit idle while expedited freight costs decimate job margins.
What we build
Complex hierarchical BOMs with versioning, engineering change orders (ECO), and component substitution logic.
Recursive BOM explosion engine, scrap percentage modeling.
Dynamic visual scheduling taking machine maintenance, worker skills, and shift calendars into account.
Constraint-based scheduling algorithm, real-time Gantt canvas.
Planned
Preventive maintenance against machine hours
Work orders raised before the breakdown, not after.
Linked
Material availability to production orders
Shortages show up before the job is released.
We measure your baseline in discovery and report against it. No borrowed percentages.
Automation built in
When a production order is scheduled, picking waves automatically generate for raw materials, and assembly terminals display CAD specs.
Services
Buy one service or the whole set. Each card links to the page that covers it in depth.
Approach map · Business systems implementation
Open any stage to see what we do, what you receive and what we need from you.
We sit with the people doing the work and map how orders, stock and money actually move today, including the spreadsheets nobody mentions in the first meeting.
Critical spreadsheets that management does not know staff rely on.
We design the data model, roles, approval rules and integrations on paper before anything is configured.
Sales and warehouse asking for conflicting things mid-build.
We provision environments, configure the standard modules to the blueprint, and build any approved extensions.
Configuration drifting away from what was agreed in the blueprint.
We extract customers, vendors, products and balances from your current tools, remove duplicates and load trial datasets you can check.
Bad legacy data being carried into the new system on day one.
We connect the system to the tools that stay: banks, e-commerce stores, payroll, shipping and anything else agreed in the blueprint.
Silent sync failures that nobody notices until month-end.
Your staff test real scenarios in staging and learn the system role by role, with recorded guides they can return to.
Staff meeting the system for the first time on go-live day.
We freeze the old system, move the final changes across, verify opening balances and switch over, usually across a weekend.
Downtime during trading hours.
The team that built the system stays on it after go-live: fixing issues on the day they surface, adjusting screens staff struggle with, and sitting with finance through the first month-end close.
Early friction pushing staff back to the old spreadsheets.
With clean data in one system, we automate the repetitive work around it: invoice capture, reorder drafts, approval routing and alerts.
The new system settling into a passive record-keeping tool.
Supported platforms
Hardware & ecosystem connectivity
Barcode & RFID
Zebra, Honeywell, GS1-128 scanners
Shipping & logistics
FedEx, UPS, DHL, ShipStation
Payments
Stripe, Razorpay, Adyen, ACH & SEPA
Messaging
WhatsApp Business API, SMS, email
Commerce
Shopify, WooCommerce
Event streaming
Apache Kafka, RabbitMQ, Redis
Identity & SSO
Okta, Entra ID, OAuth 2.0, SAML 2.0
Document AI
Claude, OCR engines, form recognizers
For the technical evaluator
Data model and deployment guardrailsData model & schema
BOM, Work Center, Routing, Production Order, Work Order, Quality Checks.
Migration & cutover
BOM extraction from CAD/ERP, work center capacity baseline calibration.
API surface & webhooks
OPC-UA / MQTT industrial IoT connectors, MES REST endpoints.
Deployment & hosting
Shop-floor localized industrial gateway with cloud synchronization.
Client work
+30%lead to customer conversion
Excel & Paper to System
30% more leads converted after an HVAC manufacturer left spreadsheet selling behind
Production to dispatchend to end
Legacy System Replacement
A lubricants manufacturer's first real ERP, from production to dispatch
16 to 1workbooks replaced by one ERP
Excel & Paper to System
A precision valve manufacturer moves from 16 spreadsheets to one Odoo ERP
FAQ
Cost, timeline, data migration and what we need from your team, answered plainly.
Ask us directlyYes. We support standard industrial IoT protocols including OPC-UA and MQTT to capture machine status and cycle times automatically.
For a connected business
Next step
Book a 30-minute consultation, or start the configurator with this module already selected.
First call: 30 minutes · A senior consultant, not a sales rep