Ahmedabad, Gujarat · Serving India, the United States, Canada, Europe and the Middle East

Manufacturing

Heavy machinery and engineered equipment

Long sales cycles, engineered-to-order builds, job costing per serial number and an installed base you can sell spares to.

Two workers operating a machine on a factory floor

The problem

What breaks today, and what we usually build

What breaks today

Every order is engineered, so a quote waits weeks for costing and the bill of materials changes after the order is signed. Job costs are known only after delivery, and nobody can say which machines in the field are due for service or spares.

What we usually build

A CRM for long, multi-stakeholder opportunities feeding an ERP where each order becomes a project, the released engineering BOM becomes the build BOM, costs collect per serial number and every shipped machine joins an installed-base record.

Automations worth building

Quotes built from configured options and current costs, alerts when a released BOM change affects an open order, and service and spares reminders by machine and running hours.

What we measure in discovery

Days from inquiry to quote, margin estimated at quote against margin at delivery, engineering changes after order, spares revenue per installed machine.

Systems it usually connects to

  • CAD and PDM (SolidWorks, Autodesk Inventor)
  • CNC and CMM inspection reports
  • Quote configurators
  • Freight and export documentation
  • Field service and technician apps

Rules

Rules your systems have to follow

What each rule means for your systems. Your counsel and accountants confirm what applies to you; we build the controls and reports.

Machinery Regulation (EU) 2023/1230, replacing the Machinery Directive

Machines sold in the EU carry CE marking backed by a technical file and declaration of conformity, so those documents should be tied to the serial number and the exact build that shipped.

Pressure equipment codes (PED in the EU, ASME in North America)

Valves, vessels and fittings often ship with material and test certificates such as EN 10204 3.1, so certificates have to follow each part from receiving to the shipment.

Export controls (SCOMET in India, EU Dual-Use Regulation, US EAR)

Some machines, valves and parts are controlled items. The item master carries the classification, and orders to restricted destinations or end users are held for review.

Where we fit

We fit engineered-to-order and precision manufacturers that need sales, builds and service linked by serial number. We do not do mechanical design or CNC programming; we connect CAD and PDM to the ERP so the released BOM is the one that gets built.

FAQ

Questions about heavy machinery projects

Fit, rules, platforms and where to begin.

Ask us directly
How does the ERP handle a bill of materials that changes after the order?

Engineering releases a new BOM revision, and the system shows which open orders and purchase orders it affects. Planning decides per order whether to adopt the change, and the decision is recorded.

Can we see the margin on each machine while it is being built?

Yes. Material, labor and subcontract costs collect against the order as they happen, so the estimated margin from the quote can be compared with actual cost before the machine ships.

Which platform fits heavy machinery and engineered equipment?

Zoho CRM or Salesforce for the sales cycle; Odoo or ERPNext for make-to-order and machining shops; Dynamics 365 where project accounting spans several entities. We confirm the fit in a platform selection, with written reasons for and against each option.

Where do we start?

With the Operations & Systems Diagnostic: find out what is really slowing the operation down. It ends with a written deliverable you can use with any vendor, including us.

Next step

Not sure what to fix first?

Book a 30-minute consultation. We look at how your operation runs and tell you what we would do first, including when the answer is a simpler tool.