Manufacturing
Heavy machinery and engineered equipment
Long sales cycles, engineered-to-order builds, job costing per serial number and an installed base you can sell spares to.

The problem
What breaks today, and what we usually build
What breaks today
Every order is engineered, so a quote waits weeks for costing and the bill of materials changes after the order is signed. Job costs are known only after delivery, and nobody can say which machines in the field are due for service or spares.
What we usually build
A CRM for long, multi-stakeholder opportunities feeding an ERP where each order becomes a project, the released engineering BOM becomes the build BOM, costs collect per serial number and every shipped machine joins an installed-base record.
Automations worth building
Quotes built from configured options and current costs, alerts when a released BOM change affects an open order, and service and spares reminders by machine and running hours.
What we measure in discovery
Days from inquiry to quote, margin estimated at quote against margin at delivery, engineering changes after order, spares revenue per installed machine.
Systems it usually connects to
- CAD and PDM (SolidWorks, Autodesk Inventor)
- CNC and CMM inspection reports
- Quote configurators
- Freight and export documentation
- Field service and technician apps
Rules
Rules your systems have to follow
What each rule means for your systems. Your counsel and accountants confirm what applies to you; we build the controls and reports.
Machinery Regulation (EU) 2023/1230, replacing the Machinery Directive
Machines sold in the EU carry CE marking backed by a technical file and declaration of conformity, so those documents should be tied to the serial number and the exact build that shipped.
Pressure equipment codes (PED in the EU, ASME in North America)
Valves, vessels and fittings often ship with material and test certificates such as EN 10204 3.1, so certificates have to follow each part from receiving to the shipment.
Export controls (SCOMET in India, EU Dual-Use Regulation, US EAR)
Some machines, valves and parts are controlled items. The item master carries the classification, and orders to restricted destinations or end users are held for review.
Where we fit
We fit engineered-to-order and precision manufacturers that need sales, builds and service linked by serial number. We do not do mechanical design or CNC programming; we connect CAD and PDM to the ERP so the released BOM is the one that gets built.
Modules
The business modules we usually start with
- CRMEvery inquiry routed, every follow-up tracked
- Manufacturing & MRPBills of materials, work orders and capacity
- Project ManagementTimesheets, budgets and live project margin
- Inventory & WarehouseBarcode bin tracking across every warehouse
- Helpdesk & SupportOne queue for email, portal and chat
- AI Lead Qualification & ScoringAI automation with human approval
- Automated Exception Routing & Approval EnginesAI automation with human approval
- Enterprise Knowledge & Policy AssistantAI automation with human approval
Platforms
Platforms that usually fit
Zoho CRM or Salesforce for the sales cycle; Odoo or ERPNext for make-to-order and machining shops; Dynamics 365 where project accounting spans several entities.
- 01 Zoho One One suite for sales, service, finance and people, quick to roll out and run by a small team
- 02 Odoo Enterprise A modular, highly customizable all-in-one business ERP
- 03 Microsoft Dynamics 365 Deep integration with Microsoft 365, Azure, and enterprise supply chain ecosystems
- Not sure which one? Compare platforms side by side · Platform selection
Client work
Related client work
Published with client consent.
Case study · Manufacturing
+30% lead to customer conversion 30% more leads converted after an HVAC manufacturer left spreadsheet selling behind
Case study · Precision manufacturing and export
16 to 1 workbooks replaced by one ERP A precision valve manufacturer moves from 16 spreadsheets to one Odoo ERP
Where to start
Fixed-scope offers to begin with
Each ends with a written deliverable you can use with any vendor, including us.
More in Manufacturing
Other manufacturing sectors
- AutomotiveOEM schedules read straight into planning, PPAP files kept per part revision and heat-lot traceability to every shipment.
- ChemicalsFormulas that scale by batch size, certificates of analysis built from test results and hazard data that follows every shipment.
- Food processingLot traceability from raw material to dispatch, shelf-life control and recipes that cost themselves.
- TextilesRolls tracked by lot and shade, job work you can see outside the factory and style costing across sizes and colors.
FAQ
Questions about heavy machinery projects
Fit, rules, platforms and where to begin.
Ask us directlyHow does the ERP handle a bill of materials that changes after the order?
Engineering releases a new BOM revision, and the system shows which open orders and purchase orders it affects. Planning decides per order whether to adopt the change, and the decision is recorded.
Can we see the margin on each machine while it is being built?
Yes. Material, labor and subcontract costs collect against the order as they happen, so the estimated margin from the quote can be compared with actual cost before the machine ships.
Which platform fits heavy machinery and engineered equipment?
Zoho CRM or Salesforce for the sales cycle; Odoo or ERPNext for make-to-order and machining shops; Dynamics 365 where project accounting spans several entities. We confirm the fit in a platform selection, with written reasons for and against each option.
Where do we start?
With the Operations & Systems Diagnostic: find out what is really slowing the operation down. It ends with a written deliverable you can use with any vendor, including us.
Next step
Not sure what to fix first?
Book a 30-minute consultation. We look at how your operation runs and tell you what we would do first, including when the answer is a simpler tool.